Hover over thumbnail images to see our geothermal process.
All piping used in Geothermal Systems is DR11 HDPE fusion welded.
Drilling 250 Foot Geo Wells on a 718 Well Project.
Pressure Grouting each well from the bottom to top insuring consistent thermal
conductivity.
Well Field (Closed Loop System) manifold 4 foot below future parking lot,
sand imbedded, and compacted.
Well Field (Supply and Return) with reverse return.
Pressure Test Each Field to 100 PSI to Ensure Integrity Prior to Backfill.
Locate Disks are Placed on Each Corner of Field along with Ditch tape for
Protection and Future Verification of Well Field.
All Purge Assemblies and Manifolds Shop Fabricated.
Purge Assemblies Mounted Inside Building.
Heat Pump with Circulating Pump Kit.
Inside Piping Supported by V-Bottom Hangers, Placed in a V-Track with
Non-Potable Water Stickers.
Middle School Well Field Locations.
All piping used in Geothermal Systems is DR11 HDPE fusion welded.